Discover modern elegance at Platinum Condominium, situated at 480 NE 30th St, Miami, FL 33137. Developed by Maysville Inc. & A.R. Development Group Inc. and completed in 2006, this contemporary condominium offers one to three-bedroom apartments with stylish designs and city views. Residents can enjoy an array of amenities, including a pool, fitness center, and rooftop terrace. Platinum Condominium's prime location in the vibrant Edgewater neighborhood provides easy access to upscale dining, boutique shopping, and cultural attractions. Experience a lifestyle of modern sophistication and urban convenience at Platinum Condominium.
Building Details
Association Name
THE PLATINUM CONDOMINIUM ASSOCIATION INC.
Association Phone
305-438-2829
Year Built
2006
Total Floors
22 Floors
Total Units
119 Units
Architect / Designer
—
Bedrooms
1 to 3
Unit Size Range
828 to 1,692
Neighborhood
Edgewater
Folio Number
—
Full Address
480 Northeast 30th Street, Miami, FL, 33137-4318
Amenities & Lifestyle
24-hour security and concierge Covered parking Fitness center and spa Lap pool Jacuzzi, sauna and steam room Panoramic views of Miami Beach, Biscayne Bay and Downtown Miami
Rental Restrictions
Owners may rent their units a maximum of two (2) times per year. No lease can be less than six (6) months.
Pet Policy
Yes · Owners only · 2 pet max · 25lbs weight limit
HOA & Financial
Avg HOA / Month
—
Application Fee
—
Approval Timeframe
—
Special Assessment
No current info — ask association if any assessments are planned or in progress.
HOA Fee Includes
Basic cable (Xfinity), water, sewer and trash removal are included in the condominium association dues.
Reserve Status
Information not yet gathered — ask the association for reserve details
Lender & Purchase Requirements
Right of First Refusal
Status unknown — contact HOA to confirm if they hold purchasing rights
Down Payment Notes
Not disclosed — down payment requirements vary by lender and building
Florida Condo Reform & Structural Compliance
SIRS Compliant
This building has completed its Structural Integrity Reserve Study as required by Florida SB 4D (2022).
SIRS Required (3+ stories)✓ Yes
SIRS Study Completed✓ Yes
SIRS Reported to State✓ Yes
Phase 1 Milestone InspectionVerify with HOA
40-Year RecertificationDate not confirmed — verify with association or local municipality
Florida Law Note: SB 4D (effective Dec 31, 2024) requires all condo associations with buildings 3+ stories to complete a SIRS and fund reserves accordingly. Contact the association for full reserve disclosure and inspection phase reports before closing.